The 800 cubic meters / hour sewage treatment plant undertakes the production sewage discharged by each device, which is an important part of the fifth-phase project. As of press time, the tar sands of the nine storage tanks, the bottom mold of the oil trap pool and the first step of the steel bar bundling, the sludge return pond wall bundling, and the biochemical pool cushion have been completed. The foundation of the primary and secondary air flotation ponds, the walls of the coagulation and flocculation ponds, the cushion of the second settling ponds, and the bottom of the sludge return ponds have been poured. At this stage, the homogenization tank, biochemical tank, secondary floor tank reinforcement, secondary air flotation tank column reinforcement, coagulation flocculation tank bottom and wall reinforcement are undergoing lashing operations.
At present, under the premise of ensuring safe construction, all construction units are accelerating the construction progress and completing the construction tasks on time and in terms of quality and quantity.
Scan the QR code to read on your phone
Phone:+86-317-5907000/5606579
Address: Middle section of Nanshugang Road, Huanghua Port, Bohai New District, Cangzhou, Hebei Province
E-mail:xinhaigroup@hbxhhgjt.com
Hebei Xinhai Holding Co., Ltd. Copyright © 2019 All rights reserved 冀ICP备19029859号